Inspection Details

  1. Reviewed all documents in accordance with each QCM procedure.

  2. Verified material traceability numbers.

  3. Verified dimensions and thicknesses.

  4. Reviewed the drawings and strength calculations.

  5. Stamped the welding inspection numbers.


Items to Be Corrected

  1. Drawing update required (Design Data and safety valve information).

  2. Strength calculation update required (safety valve information).

  3. Coded marking was missing → Coded marking to be reapplied.

  4. Tube raw material No. did not match the mill sheet → Recheck required.


During the inspection, a few discrepancies were found, and traceability verification and document updates were requested.




Contact

​(주)쎈엔지니어링

B-4F, 18, Heungdeok 2-ro 87beon-gil, 

Giheung-gu, Yongin-si, Gyeonggi-do,

Republic of Korea 16954

 

Tel: 031-214-0501

Fax: 031-624-6144

lee@ssen-eng.com

Working Time: 8:30 a.m. ~ 5:30 p.m.

Copyrights ⓒ SSEN Engineering Co.,Ltd. All rights reserved.

bottom of page