Italy - KEA Inspection in KS B 6750
- 5일 전
- 1분 분량
ITP for each equipment item was reviewed.
Dimensional inspection reports were verified.
The weld list, welder qualification records, and welding logs were reviewed.
Pressure gauge calibration certificates were verified.
Hydrostatic pressure testing of both the shell side and jacket side was witnessed.
Nameplate information was verified.
The KEA Structural Inspection Number was confirmed to be properly stamped.




